YEAR:

2017 – 2020

 

PROJECT:

Kampala Water-Lake Victoria WATSAN Project Package 4B: Construction of the Katosi Drinking Water Treatment Plant and Nsumba Main and Reservoir. PRN: NWSC-HQRS/WRS/2016-17/162209. Conceptualised and conducted preliminary line route surveys of the proposed 47Km 15MVA 33kV overhead line from the proposed Mukono Industrial Park Substation and associated 33/3.3KV and 33/0.4KV substations and associated LV reticulation network at the proposed Katosi and Nsumba water main and reservoir.

 

CLIENT/FUNDING:

Ministry of Local Government/African Development Bank

 

VALUE OF CONSULTANCY:

UGX 46,000,000